বাড়ি পণ্যটাওয়ার নির্মাণ সরঞ্জাম

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System

সাক্ষ্যদান
চীন Changshu Xinya Machinery Manufacturing Co., Ltd. সার্টিফিকেশন
চীন Changshu Xinya Machinery Manufacturing Co., Ltd. সার্টিফিকেশন
ক্রেতার পর্যালোচনা
We will try very hard to build the market for your products in India.

—— Arun Maity

The Tools for Tower Erection works very well.I am going to introduce to other companies in local.

—— Muhammad Shafique Khan

I imported some tools which is new to Vietnam market.I think my customers will like it.

—— Nguyen Manh Thang

তোমার দর্শন লগ করা অনলাইন চ্যাট এখন

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System
3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System

বড় ইমেজ :  3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System

পণ্যের বিবরণ:
Place of Origin: Jiangsu,China
পরিচিতিমুলক নাম: XINYA
সাক্ষ্যদান: ISO
Model Number: JJM3D
প্রদান:
Minimum Order Quantity: 1sett
মূল্য: USD950-1150/set
Packaging Details: plywood case
Delivery Time: 7 workdays after payment
Payment Terms: L/C, T/T,
Supply Ability: 100sets/week

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System

বিবরণ
Application: Cable Pulling Capacity: 30 KN
Rated power: 3 KW Weight(KG): 108
Dimension(mm): 770*600*460 Maximum pulling speed: 7 m/min
Engine: Electric engine 220V Type: electric winch
Name: 3 ton electric winch
লক্ষণীয় করা:

steel erection tools

,

lattice poles

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 0

 

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 1

High Quality 3 Ton Electric Lifing Hoist Winch Used for Tower Erection

 

Application

3 ton Electric winch is used in power transmission and distribution engineering, telephone construction tower 

erection, traction cable, line, hoisting tools or heavy objects, the electric winch is driven by a belt, 'effectively prevent the damage of overload, there are pros and cons and the speed of file, anti reverse 'gear moment to ensure construction safety.

Winch can be modified as per requirement, such as changing curve capstan into straight even

cylindrical  shape and coming with steel rope.

 

Characteristic

1. Small Volume & Compact Structure.
2. Light Weight,Easy to Transport.
3. High Efficiency,Save Labor.
4. Widely Used,pulling,hoisting,lifting and so on.
5. Safe & Reliable,Interlock Brakes System.

 

Maintenance and safe use

 

In order to maintain the normal operation of the cutter mill, to extend the service life of cutter cutter mill, we must strengthen the cutter mill maintenance and repair. The operator must understand the entire machinery of the structure, performance, proficiency in use.

1, the permissible load on the roll is 3T: when slow turn 3000 kg, 1800 kg when fast forward; when 5T slow turn 5000 kg, 2500 kg when fast forwarding may not overloaded.

2, 1/4 speed gear box lubrication oil must be maintained.

3, in order to prevent the phenomenon of jump block, in the allocation block that has the effect of shifting fork positioning of the ball as the spring. Therefore, when using, pay attention to check whether the top spring ball firmly. Before use, such as strong, you must replace the spring.

4, automatic brake and brake interlock should always check the wear condition of bakelite, the automatic braking gear rotation and back loose clearance is 0.5 mm, greater than 1 mm must be replaced bakelite, otherwise easily lead to brake failure and accidents.

5 speed gear box in automatic brakes when lifting, automatic braking gear issue, "Benedict, Benedict, Benedict" sound, proven speed gear is working properly, it is not this sound back to loose.

6, base of anchoring methods: by bearing support on both sides of the drum (with two holes) of the anchor point, not as an anchor point to other locations.

7, roll bearing locking screw, must cooperate with corresponding holes, instead of prohibiting the use of other screw locking screw.

8, the gear box housing is cast aluminum, screw it on too tight and unnecessary disassembly, but can not struck with a hammer.

9, after the machine by the long-distance transport, the need for a detailed examination of each component fastening screws loose, lubricating oil is normal.

10, the prime mover is gasoline, diesel, according to the machine can use regulatory requirements.

11, before each use of the machine, you should check whether the debris body, whether the impact of machine run around obstacles,

Also check each transmission, everything is normal, it can be used.

12, the machine after each use, the machine should promptly remove dust, oil and other dirt, all cleaning wo

 

 

Technical Data 

Model Type Engine Power Gear Pulling Speed(m/min) Pulling Force(Ton)
JJM3-D Electric Engine Slow 4 3
Quick 7 1.8
Reverse 4  
 

 

Practical Application

3 Ton Electric Lifing Hoist Winch 220V for Tower Erection Interlock Brakes System 2

যোগাযোগের ঠিকানা
Changshu Xinya Machinery Manufacturing Co., Ltd.

ব্যক্তি যোগাযোগ: Ms. Wendy

টেল: +8615050307199

আমাদের সরাসরি আপনার তদন্ত পাঠান (0 / 3000)

অন্যান্য পণ্যসমূহ